top of page
dji_fly_20260205_092118_74_1770304946526_photo_optimized.JPG
Emergency Line (217) 440 3213

Galt, MO

March 2025 – March 2026


MB Construction completed a targeted water system upgrade in Galt, Missouri, including 600
linear feet of PVC water main replacement with new valving, hydrants, and associated
appurtenances, along with multiple hydrant replacements. The project also featured the
installation of a new booster pump station, including site piping, electrical, controls, and a mobile
SCADA system.


A key highlight of this project was the precise coordination and installation of the booster pump
station. Crews completed all piping and encased exposed infrastructure in concrete prior to the
delivery of the pump house, allowing it to be set directly into place with a perfect fit on the first
attempt. This project demonstrates MB Construction’s attention to detail, planning, and ability to
execute complex system integrations efficiently.

Get A Quote Today

bottom of page